Proof the path
Duct is mandrel-tested and proofed end to end; obstructions cleared and a pull line or blowing head staged before any cable is committed.

/ Discipline 02
Fiber and cable placement through installed conduit, innerduct, and microduct — by mechanical pull or air-assisted jetting, chosen for the pathway, distance, and cable type. Every run stays inside the manufacturer's tension and bend-radius limits, footage is logged by segment, and continuity is confirmed before the crew moves on.
Methods
Pull / blow
Pathways
Conduit / innerduct / microduct
Blow distance
To ~2 km / shot
Logging
Per-segment footage
/ 02 — Capabilities
Every line below is in-house. We don't subcontract to crews we haven't trained ourselves.
/ 03 — Process
Duct is mandrel-tested and proofed end to end; obstructions cleared and a pull line or blowing head staged before any cable is committed.
Method is chosen for the route — distance, bend count, duct size and cable type decide it, not crew preference.
Cable is pulled with tension monitoring or jetted with a fiber blower, held inside the manufacturer's load and bend-radius limits.
Placed footage, pulling tension and blowing distances are logged by segment, and continuity is confirmed before crews demobilize.
/ In the field



/ 04 — Turnover package
/ 05 — Other disciplines

Directional drilling, conduit placement, trenching, fiber placement and restoration for underground broadband and OSP fiber builds.
View
Fusion splicing, OTDR testing, labeling and signed closeout packages — built to reduce rework.
View
Strand, cable placement, transfers, overlash and closure work on the pole line.
View
FTTH, MDU, commercial and customer-fulfillment install crews for broadband providers.
View
Route review, permitting, utility coordination and CAD/GIS that get a build ready for the field.
View/ Next step