/ Discipline 03 — Always-on
Fiber splicing, testing, labeling, and documentation services designed to reduce rework and support reliable network performance after turnover. Every splice logged, every link tested, every closeout signed before crews leave the site.
Max fiber count
864ct
Test instrument
OTDR / OLTS / Fluke
Splice loss target
≤ 0.10 dB
Documentation
GIS + PDF
/ 02 — Capabilities
Every regional hub keeps these capabilities pre-staged — splice trailers loaded, fusion gear charged, restoration kits ready.
/ 03 — Response timeline
/ Typical fault, regional footprint
Tray-by-tray plan built from the splice matrix before crews mobilize to the cabinet.
Splicing performed in climate-controlled trailers, logged by tray, position and technician.
Bidirectional OTDR, OLTS and light-level readings captured per fiber and archived per strand.
Signed splice logs, test results and as-builts delivered as one package on turnover day.
/ 04 — Turnover package
/ 05 — Other disciplines

Directional drilling, conduit placement, trenching, fiber placement and restoration for underground broadband and OSP fiber builds.
View
Cable pulling and air-assisted fiber blowing through conduit and microduct — placed to spec and logged by segment.
View
Strand, cable placement, transfers, overlash and closure work on the pole line.
View
FTTH, MDU, commercial and customer-fulfillment install crews for broadband providers.
View
Route review, permitting, utility coordination and CAD/GIS that get a build ready for the field.
View/ Next step