Underground Fiber Construction & Directional Drilling

/ Discipline 01

Underground fiber construction & directional drilling.

Underground fiber and OSP construction for broadband and utility networks — led by directional drilling (HDD) and backed by conduit placement, trenching, fiber placement and restoration. Crews mobilize with the drill rig, bore under roads and obstacles, and capture GPS as-builts daily before demobilization.

All disciplines
/ 01 Bore sizeUp to 12" HDD
/ 02 Vault depthTo 12 ft.
/ 03 ConduitHDPE / SCH40 / SCH80
/ 04 Survey gradeSub-meter GPS

/ 02 — Capabilities

The full discipline — line by line.

  • 01Directional drilling / HDD
  • 02Conduit placement
  • 03Cable pulling and blowing
  • 04Trenching and excavation support
  • 05Handholes, vaults, and pathways
  • 06Site restoration

/ 03 — Process

Sequence,
not chaos.

  1. 01

    Locate & permit

    811 locates honored, permits in hand, private locates contracted where utilities aren't public-record.

  2. 02

    Bore or trench

    Directional drill or open-cut — selected for soil, traffic and timeline, not crew preference.

  3. 03

    Place & pull

    Conduit, vaults and handholes placed; cable pulled, blown or innerducted to spec.

  4. 04

    Restore & record

    Surface restoration to municipal standard, GPS as-built captured before crews demobilize.

/ 04 — Turnover package

What you
get at the end.

  • 01GPS as-built drawings
  • 02Permit closeout package
  • 03Compaction & restoration sign-off
  • 04Vault & conduit inventory

/ Next step

Ready to scope
underground fiber construction & directional drilling?